Showing 8136 results

Record description
Item
Print preview View:

Addington Water Pumping Station: Photographs

Panel over north door. [Panel reads: Corporation of Croydon, Addington Well, These buildings were erected AD 1888. James W. Hobbs, Mayor. Charles C. Morland JP Chairman of Water Committee. Charles M. Elborough Town Clerk. Thomas Walker Borough Engineer. He sendeth the springs into the valleys which run among the hills Psalms 104.10]

Addition to F/ 32Defence Plan of January1944

Follow up defence plan to that detailed in AR341/8. includes plans for immediate and secondary action, with information detailing which platoon was to guard which area in the event of an attack. on the back is attached a copy of AR341/8 and a blueprint map of the local area with positions marked.

Results 126 to 150 of 8136